Factory Registration / Establishment License
Registration of a factory or establishment with the Department of Inspection for Factories and Establishments.
Last verified 1 September 2026 by legal-reviewer · Methodology · Always confirm with the issuing authority before acting.
- Issuing Authority
- Department of Inspection for Factories and Establishments (DIFE)
- Processing Time
- 15 working days
- Complexity
- Moderate
- Renewal Cycle
- Every 12 months
Who needs this
Factories and establishments covered by Bangladesh Labour Act 2006.
When it becomes required
Within 30 days of commencing operations, for covered establishments.
Legal basis
The Bangladesh Labour Act 2006
Relevant industries
- Garments & Textiles
- Manufacturing
Required documents
-
Mandatory
Trade Licence
Local government licence.
-
Mandatory
Factory layout + Machinery list
Premises and equipment details.
-
Conditional
Fire + ECC (if required)
Safety/environmental where applicable.
-
Mandatory
NID + Incorporation (if company)
Identity and entity proof.
Tick each document as you collect it — progress for this licence is saved in your browser only. We never receive it.
Process
-
Prepare factory layout
Draw premises and machinery plan.
-
Apply to DIFE
File with trade licence, layout and fee.
-
Inspection
DIFE officer inspects workplace and safety.
-
Collect registration
Receive Factory Registration Certificate.
Fees and timeline
All amounts in BDT unless noted. Verified figures are dated; always confirm before paying.
| Government fee | BDT 2,000 – 10,000 Scaled by factory size per DIFE schedule. |
|---|---|
| Professional assistance | Request a quote → We scope government fees, VAT, stamp and other costs for your case — no public price list. |
| VAT | No VAT on government fee — check current NBR rules. No VAT on registration. |
| Stamp / duty | BDT 1,000 Affidavit stamp. |
| Other fees | BDT 1,000 – 3,000 Trade licence, fire, ECC where applicable. |
| Total estimated | BDT 4,000 – 14,000 Sum of government + stamp + other (ex-VAT, ex-professional). Ask for a formal quote. |
| Processing time | 15 working days (official) 15 official days; 15–30 observed. |
| Renewal | Renew every 12 months. Renew annually. |
Common mistakes
No fire/ECC where required, missing worker register, premises not inspected.
Frequently asked questions
When must I register a factory?
Within 30 days of commencing operations for covered establishments.
What is the fee?
BDT 2,000–10,000 government fee plus professional assistance.
Does a factory need ECC and fire?
Conditional — depends on size, Red/Orange category and occupancy.
Official sources
-
Legislation / Act
-
Official website